Real Estate

Interwest’s Real Estate and Right of Way Services group offers unique, innovative and cost-effective solutions to the most challenging Right of Way projects by delivering comprehensive Right of Way acquisition, relocation and related real property services to counties, cities, special districts and agencies throughout California and Nevada.

Services

  • Program Management
  • Project Management
  • Title Services and Escrow Coordination
  • Right of Way Engineering
  • Environmental Support
  • Appraisal Services
  • Acquisition
  • Relocation Assistance (Residential and Business)
  • Interim Property Management
  • Cost Studies and Report Preparation
  • Utility Relocation and Coordination
  • Caltrans Right of Way Certification

Key Contact

Kent Jorgensen, Director of Real Estate Services
(949) 299-5306
kjorgensen@interwestgrp.com

Feature Projects

BART Silicon Valley Berryessa Extension (SVBX) Project and BART Silicon Valley Phase II (BSV) Project

Client: Santa Clara Valley Transportation Authority (VTA)

Our team at Interwest contributed to the implementation of the SVBX Project, which consisted of a 10-mile, two-station extension of the regional BART System, beginning in Fremont at the future BART Warm Springs Station, proceeding through Milpitas, and temporarily ending in the Berryessa area of North San Jose. The project required approximately 100 property acquisitions and over 40 business relocations. Most of the acquisitions were from private property owners; however, there was also a significant number of acquisitions required from cities, water districts and the Union Pacific Railroad. The BSV Project begins at the termination point of the SVBX Project and will contain an approximately five-mile tunnel with three underground stations and one at-grade station. Final design is moving forward, and it is estimated that approximately 85 acquisitions will be required.

Bundy Canyon Road Widening Project

Client: City of Wildomar

The Bundy Canyon Road Widening Project will widen, realign and improve Bundy Canyon Road for approximately 2.25 miles between the I-15 and The Farm Road. Specifically, the road will be widened from two lanes to four lanes, and with one additional lane being added in each direction. In addition, the project will include the construction of a center-striped median, a sound wall to protect 28 residential properties, left-turn lanes at major intersections, signage and the introduction of signalized intersections in certain areas of the project alignment. To ensure successful completion of this project, Interwest’s team of Right of Way professionals is providing Title, Appraisal, Acquisition and Relocation Assistance services for 61 parcels. The assignment includes full acquisitions, partial acquisitions, residential relocations and temporary construction easements, and slope easements. The project is locally funded with Riverside County Transportation Uniform Mitigation Fee (TUMF) and Bundy Canyon Road/Scott Road Benefit District funds.