Capital Projects

 

 

Safe Routes to School Laguna Creek Trail Bridge Project
2009

The Laguna Creek Bridge Project constructed a bridge across Laguna Creek to provide safe and direct access to Jack Hill Park, and implement improvements to encourage bike/pedestrian use of the Laguna Creek Bicycle/Pedestrian Trail to get to school.

The bridge construction is over Laguna Creek, connecting to the Laguna Creek Trail between Ringe Circle and Porto Rosa Street. A bike education effort was also apart of the project to encourage recreational bike use to nearby schools. The project was primarily funded through a Safe Routes Grant secured by Interwest for City. Interwest took the lead on all interactions with Caltrans Local Assistance.

Interwest also provided Transportation Planning, Traffic Engineering,Transportation Programming, Real Estate Services, Capital Project Management and Capital Construction Management services.

Laguna Creek Trail Bridge Project

Wildomar Sidewalks to Schools Improvement Project
2011

Interwest was responsible for the design and management of sidewalk and roadway improvements to two existing elementary schools - Wildomar Elementary School and Ronald Reagan Elementary School.  Improvements included new sidewalks, handicap-accessible ramps, curb and gutter, and roadway widening along selected routes to each school.  The projects were funded by bicycle and pedestrian safety grants. Project required coordination with Caltrans Local Assistance. The Wildomar Elementary improvements were approximately 1.5 acres in size and the Ronald Reagan improvements consisted of approximately 0.5 acres.  There were multiple unique challenges associated with each site.  The Wildomar Elementary improvements had several challenges including maintaining multiple existing driveway access points, meandering the sidewalk to avoid existing trees and utilities, and minor drainage improvements along the affected area. The biggest challenge associated with the Ronald Reagan improvements was acquiring the additional right-of-way required to construct the roadway and sidewalk.  Interwest services provided included Transportation Planning, Capital Project Management, Grant Writing & Funds Management, and Traffic Engineering. The project was made possible by two grants written and secured by Interwest for the City.

Wildomar Sidewalks to Schools Improvement Projec

Old Town Elk Grove Revitalization Project
Elk Grove, CA

The Old Town Elk Grove six million dollar revitalization project included approximately ten months of construction and area improvements to the Old Town Elk Grove Historic District. The scope of this project included installing new sections of roadway, turn lanes, pavement restriping and resurfacing, pedestrian refuges, a new water main line, parking lot facility, and a traffic signal.  The project also featured new decorative sidewalks, signs, benches, and streetlights to reflect the historic architecture of Old Town. These improvements were designed to boost the economic vitality and attractiveness of the historic district. Numerous community workshops and public participation led to a successful completion of the multi-million dollar project.

Client: City of Elk Grove

Old Town Elk Grove

Neighborhood Livability (Speed Control) Program
Elk Grove, CA

The Neighborhood Livability (Speed Control) Program is dedicated to improve safety in residential areas by implementing various traffic control strategies to manage vehicle speeds. Through extensive public outreach, the program identified several neighborhoods to implement the traffic control measures. These measures included traffic circles, speed cushions, chokers, striping, and/or signage changes. The project has been a tremendous success with the community, and community feedback reports an increase sense of safety in neighborhoods.

Client: City of Elk Grove

Neighborhood Livability (Speed Control) Program

Lewis Stein Road Widening Project
Elk Grove, CA

The Lewis Stein Road Widening Project involved extending Lewis Stein Road from West Stockton Boulevard to Big Horn Boulevard as a two-lane facility, including a bridge over Laguna Creek, with a landscaped median, bike lanes, curbs, gutters, sidewalks, an equestrian bridge, and streetlights.  It is the first project in the City of Elk Grove to include a bridge to accommodate bicyclists and horseback riders!

Client: City of Elk Grove

Lewis Stein Road Widening Project

Sheldon Road Widening / State Route 99 Interchange Project
Elk Grove, CA

The Sheldon Road / State Route 99 Interchange Project consists of replacing the existing two-lane interchange with a six-lane facility, widening and realigning the on and off-ramps, realigning East and West Stockton Boulevards, and widening Sheldon Road to six lanes with a landscaped median, curb, gutter, sidewalks, streetlights, and roadside landscaping. Once completed, this new interchange will accommodate thousands of motorists traveling on State Route 99 each day. The construction of a park-and-ride-lot is also a component of this project, providing a multi-modal element to the interchange project.

Client: City of Elk Grove

Sheldon Road Widening / State Route 99 Interchange Project

Bond Road Widening Project
Elk Grove, CA

This project involved the widening of Bond Road from two to four lanes with a landscape median and roadside landscaping.  The project also included reconstruction of two bridges over Laguna Creek, new traffic signals at Crowell Drive, Quail Cove East, and Sierra River Drive, along with intersection improvements at Elk Grove-Florin and Waterman Roads.

Client: City of Elk Grove

Bond Road Widening Project

Capital Projects
Monitor Program Effectiveness
Agency Coordination on Joint Projects
Community Outreach
Work with Utility Agencies on Relocations
Ensure Environmental Regulation Compliances
Advanced Project Planning
Bid & Award Contracts

Manage Federally Funded Projects